Milne Library News

Library Entrance Update

What's Going On — Posted by Kay Benjamin @ 14:17
The outer doors are currently being installed in the library entrance and it will be a few more weeks before the front entrance is complete. However, the tile work in the foyer and first floor stairs is complete, so the main elevator and the main stairwell are now open!

Library Entrance Construction

What's Going On — Posted by Kay Benjamin @ 14:56
The library is being outfitted with new front doors and new tiling in the entryway. The end result is going to be a fine facelift of the library entrance, but during the summer entry into the library will be through Jazzman's Cafe.  For part of the construction period, the elevator from the first floor will be unavailable. Access to the lower and upper floors from the first floor will be through the central fire stairwell, and through the fire stairwells on either end of the building. We apologize for the inconveniences. If you need to use an elevator please ask at the Circulation or the Reference desk and we'll be happy to help you. Jazzman's will not be open during the summer.

Powered by LifeType